Street Maintenance Division

The Street Maintenance Division manages the repair and maintenance of existing roadway and drainage infrastructure.
2025-2030 Five Year Plan_ with Grant Jobs_1
5-Year Street Management Plan (pdf)
5-Year Street Management Plan with work Completed (shown in blue)

Standard Maintenance Activities

The following activities are provided for 262 lane miles of streets:

  • Crack Sealing
  • Curb Repair
  • Drainage Repair
  • The entire City twice per month
  • Pavement Marking
  • Pot Hole Patching
  • Shoulder Work
  • Sidewalk Repair
  • Sign Maintenance
  • Stop Bars
  • Street Resurfacing
  • Street Sweeping
  • Striping

Street Sweeper Schedule .pdf

SweeperMap2023